Projects



Domain Interchange

Period: 2012
Client: GHD

Extent: Overhead wiring elastic system. Track Independent Checker. Track, traffic signalling & OH interface. Construction staging. Including a 3D models and perspective.

Regional Rail Link Package A independent review

Period: 2012
Client: Activate

Extent: Independently review the complete Overhead design work for Regional Rail Link Package A.

Victoria Harbour Extension

Period: 2012
Client: GHD

Extent: Extension of 315m Track and Overhead. Including scissor crossing. Clearance checking and terminus design.

Derby-Princesses-Waverley

Period: 2012
Client: Yarra Trams

Extent: Complete redesign and upgrade the existing solid Overhead network to the up-to-date elastic system.

Gold Coast Rapit Transit


Period: 2012
Client: Macdow

Extent: Producing rail bending details and rail plans for GCRT.

High St - Route 86 - Phase 2

Period: 2011
Client: GHD

Extent: Redesign and upgrade the Overhead wiring at High St (Northcote), utilising an auto tension system and improving the overall network.

East Preston Depot upgrade

Period: 2012
Client: Yarra Trams

Extent: Track design Road 1 to 10. Including Rail Plan, Rail Bending diagrams, drainage and track bonding.

Travancore - Mt Alexander Rd


Period: 2011
Client: Cardno

Extent: Complete redesign of the Overhead infrastructure due to road and footpath changes incorporating an auto tension system.

Adelaide-Nth Terrace Track & OH

Period: 2012
Client: Wilko Solution

Extent: Development of options for both track and OH followed by detailed design for a new cross over and converting the single to a double track alignment.
OH design consists of centre poles with boom tube and elastic suspensions.
Horizontal & vertical track alignment.

Spencer St. Intersections

Period: 2010-2011
Client: Yarra Trams

Extent: Redesign and upgrade the Overhead infrastructure at Bourke St, Collins St & Flinders St intersections, minimising the number of span wires.

Gold Coast Rapit Transit Tender

Period: 2012
Client: Abigroup and Yarra Trams

Extent: Concept design and preparing system design for 13km of light rail GCRT.
Attending final interview with end client Bombardier

Bridge Road

Period: 2010
Client: Yarra Trams

Extent: Trolley wire redesign and renewal due to the replacement of tracks. General network upgrade and improvement, minimising support positions.

Tram Route 1 Overhead Upgrade

Period: 2012
Client: Yarra Trams

Extent: Detailed design of 8 curves on tram Route 1 to upgrade the existing Overhead system to new elastic system. Also providing technical consultancy services to client regarding trial use of new products.

Brunswick, Essendon, Kew & Malvern, Glen Huntly Depots

Period: 2010
Client: Yarra Trams

Extent: Detail design of the integrated Overhead network introducing a new overhead system. Included material schedules and construction specification; Conducting site inspections to identify user requirement issues and service conflicts; Working with the supplier and obtaining information on installation; Community consultation on Glen Huntly Depot; Tackling design challenges including unfavourable site conditions, tight yard layouts, pole loading, limited land availability for the new stabling and the existing allied infrastructure; Liaison with multiple stake holders during preliminary and final construction stages.

<<< 
  Second Page >